Low Voltage Permit

All telephone and/or computer cabling must be permitted (Low Voltage Permit) and inspected before the city will issue a Certificate of Occupancy, which must be received before you move in. Your telephone installer is responsible for getting this permit and it must be received before the electrical contractor schedules the electrical ceiling inspection, which is usually ten to fourteen days before construction is completed.

Permits are not required for vertical low voltage cabling from the ISP demarcation point to the tenant demarcation point within the leased space. Please contact IMG Technologies to organize any connectivity work that will be occurring to ensure the correct process is followed at imgsupport@img-connect.com.